Direct answer: For an existing industrial metal roof with limited spare load capacity, start with the allowable additional load documented by the project engineer. Compare it with the proposed PV system, including the modules, attachment hardware, rails and cabling. Lightweight flexible modules can be shortlisted for preliminary review. The project engineer should check structural capacity, roof condition, wind and snow loads, attachment, waterproofing and drainage. If structural information is missing, send the available drawings and site photos so the outstanding items can be identified before design.
1. Identify the roof and source documents
- Record site, building use, roof area, height, roof type, substrate, sheet profile, age and known repairs.
- Keep the drawing issue and revision, survey date, photographer or survey source and roof-area reference with the evidence.
- Check that drawings describe the actual structure; list discrepancies rather than silently correcting them.
What to check before retrofitting a profiled steel roof
Record the sheet profile and thickness, coating, age, corrosion or leaks, seams and purlin layout, plus any roof warranty or attachment restrictions. Mark corrosion, repairs, seams and drains on the roof plan and attach matching photos. Ask the roof-system and project engineers to review the substrate condition and proposed attachment.
2. Make photographs useful
Provide overview and located detail photos of edges, corners, seams, laps, drains, skylights, penetrations, corrosion, leaks and repaired areas. Include direction and a roof-plan reference. Photographs show visible condition; they do not by themselves establish material thickness, concealed connections or structural capacity.
3. Collect structural inputs
Provide available structural drawings, assessment records, roof-deck and purlin information, connection details and any documented limits. Identify the responsible professional for checking capacity and load paths. Do not infer capacity from a building label or module weight.
4. Record geometry and operating interfaces
For curved roofs, supply measured profile information, sections and local transitions. Record drainage, waterproofing, fire and maintenance access, attachment restrictions and planned construction access. Keep environmental design inputs with their source and status.
5. Issue a survey register
| Record | Required fields |
|---|---|
| Evidence item | Location, source, date and revision |
| Drawing-to-site difference | Observed condition, relevant drawing and located photo |
| Unknown input | What is missing, who will verify it and when it is required |
| Assessment handoff | Complete system concept, open interfaces and responsible project reviewers |
Questions about survey evidence
Can roof photographs replace structural records? No. They support condition and location review; hidden details and capacity may need additional investigation and professional assessment.
What if a load value is not available? Record it as an unknown input, identify the responsible verifier and keep it out of approved design assumptions until resolved.
Related resources
- Go, hold or revise: the decision record
- Overall selection checklist
- Reconcile drawings with the site survey
- Quotation information checklist
Send roof information for a preliminary selection review
Send the project location, roof drawings and revision, usable area, sheet profile and condition, site photos marked on the roof plan, and any documented allowable additional load or design wind and snow inputs. For curved roofs, include measured sections or curvature.
Content maintained by Beijing X-SOLAR Energy Co., Ltd. (X-SOLAR) | Content updated: 2026-10-24