The Rooftop PV Engineering Brief: Drawings, Photos and Handover Checklist

Direct answer: A useful project quotation starts with verified site and roof information. At minimum, provide the project location, roof drawings and photos, usable area, roof type, structural load information, environmental design conditions, preferred mounting concept, electrical interface, delivery destination and target schedule.

1. Project and site basics

  • Project name, city and country
  • Building use, height and operating constraints
  • Target capacity, schedule and delivery address
  • Customer, EPC or consultant contact

2. Roof information

Provide roof plans, usable dimensions, obstructions, slope or curvature, substrate and sheet profile, recent photos, roof age, corrosion, leaks and repairs. For curved roofs, include radius or measured geometry rather than a visual estimate.

Concept illustration for reviewing rooftop PV information and project interfaces.
Concept illustration for information and workflow review. It is not a site photograph, installation drawing or engineering approval.

3. Structural and environmental data

State the verified allowable roof load, design wind pressure, snow load, seismic requirements where relevant, edge and corner zones, drainage paths and local code basis. Module weight alone is not enough to price a complete engineered system.

4. Mounting, waterproofing and access

Describe whether adhesive bonding, rails, clamps or another concept is being considered; identify substrate coatings and waterproofing restrictions. Include fire pathways, maintenance access, cable routes and inverter locations.

5. Electrical and commercial scope

Clarify DC/AC scope, grid voltage, inverter preference, monitoring, packaging, Incoterms, destination port, warranty documentation and required certificates. A budget quotation is not final structural or electrical approval.

6. Copyable engineering brief and handover templates

Roof area is only a starting input. Obstructions, access and drainage interfaces can affect the usable layout, while shading needs its own evidence and assessment. Give every reviewer the same roof reference and document revision.

Copy the tables below into the project brief and complete the final column. These are blank recording prompts, not evidence that a survey, design or approval has been completed. Where information is unavailable, record the gap and responsible party rather than entering a guessed value.

Concept diagram linking roof drawings, obstruction and shade evidence, located photos and a revision-controlled file register.
Concept diagram; not a real project photograph or an approved engineering design.

Drawing and survey register

Record field Information to attach Project entry
Drawing identity Roof/building ID, drawing number, revision, issue date and the person or organization supplying it. Complete for this project
Common reference North/orientation, units, scale and the same reference point or grid used by the survey and photos. Complete for this project
Roof geometry and boundaries Dimensioned roof outline, levels, slope or curvature, and separately marked access, drainage and other restricted areas. Complete for this project
Drawing/site discrepancy Mark where the drawing and current survey differ; assign an owner and status for resolution before using that area in a firm layout. Complete for this project

Obstruction register

Record field Information to attach Project entry
Identity and location Give each obstruction an ID and locate it on the same roof plan: for example a rooflight, vent, plant item, drain or hatch. Complete for this project
Extent and evidence Record the surveyed footprint and relevant height with units, source and date. Cross-reference the photo; leave unmeasured dimensions unconfirmed. Complete for this project
Layout action Record the effect requiring review, such as physical occupation, access, drainage or possible shade; name the party who must confirm the response. Do not invent a universal offset. Complete for this project

Shading-evidence record

Record field Information to attach Project entry
Geometry source Link the roof orientation and surrounding-object position/height to a drawing or survey revision, with gaps clearly identified. Complete for this project
Photo context For a visible shadow, record viewpoint, direction, capture date/time and time zone when known. Mark unavailable capture details as unknown. Complete for this project
Analysis reference If an assessment is supplied, identify its preparer, geometry revision, method and assumptions. A single shadow photograph is not an annual shading or energy-yield assessment. Complete for this project

Located-photo index

Record field Information to attach Project entry
Photo identity Photo ID, roof/building ID, capture date and the corresponding plan marker, viewpoint and direction. Complete for this project
Coverage Include a roof overview and views of relevant obstructions, roof condition, edges, drainage, access and proposed cable/equipment interfaces; link close-ups to their overview. Complete for this project
Currentness and gaps State which areas the photos cover and what has changed since capture. A photo does not establish structural capacity or a hidden roof construction. Complete for this project

File handover register

Record field Information to attach Project entry
File identity and revision File ID/name, discipline/topic, revision/date and the drawing, photo or assessment records it supports. Complete for this project
Status and ownership Label the file as current, superseded or unconfirmed; identify its issuer and the party responsible for clarification. Complete for this project
Handover receipt Record the sender, intended receiver, transfer date and the revision acknowledged. Keep superseded material distinguishable from the current set. Complete for this project
Open-question log For each missing or conflicting input, state the question, its effect on the quotation/layout, responsible party and required decision. Record an agreed date when one exists. Complete for this project

Handover sequence before comparing quotations

  1. Agree the roof/building IDs and a common plan reference.
  2. Cross-link the drawings, obstruction/shading records and located photos in the file register.
  3. Separate the current source set from superseded files and log discrepancies.
  4. Send the same baseline to each bidder. Ask each quotation to identify the revisions used, assumptions, exclusions and unresolved inputs.
  5. After a drawing or site condition changes, identify the affected layout/price items for review; a received file is not an engineering acceptance.

Engineering brief questions

Can gross roof area be used as the final module layout area?

No. Keep gross dimensions separate from the area remaining after project-specific obstructions, access, drainage and other restrictions are reviewed. A shading assessment is also separate from the geometric area calculation.

What if a drawing or obstruction height is unavailable?

Send the available source and mark its limits. Identify who will obtain or check the missing input, and require the quotation to show the resulting assumption or exclusion. Do not present a provisional layout as a surveyed or approved design.

Which supporting guides can help complete this brief?

Related X-SOLAR resources

How to record missing inputs

Mark an unknown input explicitly and assign responsibility for verification. State budget assumptions, exclusions and provisional items in the quotation. Do not replace missing structural or environmental information with a guessed value.